Home / DMAIC / Measure

Measure · Tool guide 32 of 40

Process Performance

Process performance describes observed results over a defined population and period. It includes customer-output measures such as timeliness and accuracy, plus volume and guardrail measures. A baseline describes the current process; it does not explain why it performs that way.

Expected output: A trustworthy performance baseline with coverage, uncertainty and guardrails.

01 · Purpose

Why and when to use it

Use it to quantify the gap agreed in Define and create a comparable reference for later improvement.

Who takes part?

The measurement owner works with people who understand the process and the recorded data. Statistical or measurement-system decisions should involve someone able to check the assumptions and study design.

02 · Application

How to apply it

Start with an agreed measurement purpose, explicit units and trustworthy observations. Identify missing cases and assumptions before calculating.

  1. Select output and guardrail measures from agreed requirements.
  2. Validate definitions, sources and measurement suitability.
  3. Collect representative data and record exclusions.
  4. Report rates with counts, denominators, period and relevant groups.
  5. Inspect stability and uncertainty before extrapolating or comparing periods.

03 · Example

A worked measurement example

Original fictional teaching example. Small datasets illustrate the method; they are not proposed as sufficient study sizes. Supplied parameters are assumptions, not estimates from a real process.

Baseline measureIllustrative result
Late dispatch180 of 1,000 eligible orders = 18%
Order accuracy970 of 1,000 orders correct = 97%
Missing handover records20 additional cases; shown separately from the 1,000 known cases

04 · Interpretation

What the result tells you

The 18% is a known-case rate. If the 20 unknown cases belong to the same eligible population, the full rate lies between 180/1,020 = 17.65% and 200/1,020 = 19.61%, depending on their status.

Completion check: A trustworthy performance baseline with coverage, uncertainty and guardrails.

05 · Judgement

Mistakes and limitations

Changing definitions, product mix or sampling can create apparent improvement. Overall performance indices Pp/Ppk use overall spread; they are distinct from Cp/Cpk with an appropriate within-process sigma estimate.

07 · Reading

Sources and further reading

The tool list follows the accepted LeanTrainingLab overview and its reference to Six Sigma+Lean Toolset, second edition (Lunau, editor; Springer, 2013). The book chapters were not available for direct review during this build. Explanations, examples and worksheets are original teaching material. Further reading supplies professional background; local conventions are stated explicitly.